Site preparation

Site preparation

Preexisting site conditions such as overburden are common tasks in marine construction. Sites are prepared, set to grade, and stabilized using rip rap or other methods by our crews.

Concrete foundations

Concrete foundations

This project had us installing a control conduit, control lines, and pouring a pad for a control manifold for a subsea valve on a intake.

RipRap

RipRap

We can install rip rap, gabion walls, geo cloth, grout bags, and Sub Mar mats to name a few to stabilize your work area above and below the waterline. Shoreline remediation is a part of our operation services.

foundations and retaining walls

foundations and retaining walls

No matter how large or small your project, we are able to meet and exceed your expectations.

foundations

foundations

site preparation

site preparation

Site preperations

Site preperations

Until the work is ready to be done, the work area needs to be protected to limit any runoff from rain.

Dredging

Dredging

We have the experience, knowledge, and capabilities to tackle your dredging needs.

Dredging

Dredging

Dredged materials are taken to a designated disposal area . If testing is required or special disposal protocols, these are addressed and met with diligence.

Rip Rap

Rip Rap

Riprap is brought in to be placed above and below the waterline.

Dredging, Jetting, & Airlifting

Dredging, Jetting, & Airlifting

We have many methods at our disposal for excavation of your underwater work site.

Dredging and Clam bucket

Dredging and Clam bucket

Heavy equipment such as excavators and cranes are used by us to accomplish our dredging tasks.

Clam Bucket

Clam Bucket